BRIGHT SIDE OF NEWS v0.8. About | Advertise | Contact BSN USER Login
| Register
SUBSCRIBE Newsletter | RSS Feeds
v0.8
Friday, November 20, 2009
Email this to a friend.
Your friend's e-mail:
Your Name:
Your e-mail:
Message subject:

Pat Gelsinger left Intel because of Larrabee fiasco?



Last week, we learned that Patrick P. Gelsinger will leave Intel for EMC and tried to find out the reason for the move. From one side, the move had perfect sense. Pat was one of Andy Groove's men, and Paul Otellini did his best to surround himself with his aces, thus the choice of Sean Maloney was logical.

But the underlying issue wasn't that Pat was "Andy Groove's men", the issue was the war with nVidia and under-delivering on Larrabee.

As we all know, Larrabee project has been problematic at best. Intel start hyping up Larrabee long before it was ready, and the project broke all deadlines. We read through roadmaps and watched Larrabee slip not by quarters, but by years. After we saw roadmaps for introduction of Larrabee pushed back all the way to 2011, and hearing that a lot of key industry analysts are dismayed at Intel - Pat's maneuvering capability was cut to a single corner.
A lot of people we talked to were disappointed at Intel "starting a war with nVidia without a product to compete", and after hearing statements such as "Intel is a chip company, not a PowerPoint company", it was clear to us that Intel seriously "screwed the pooch" on this one.

There is no doubt in our minds that Intel is going to deliver Larrabee, as it is the future of the company. But Intel will probably spend additional billion or so USD on making the chip work [because it is quintessentially broken in hardware, we haven't even touched the software side], and come to market with a complete line-up. But unlike the CPU division that only missed Lynnfield [Core i5-700, i7-800 series] roadmap by six months, project Larrabee is now a year late, and according to documents we saw, it won't reach the market in the next 12 months. This will put a 45nm Larrabee against 28nm next-gen chips from ATI and nVidia, even though we know the caveat of using 45nm Fabs for the job. According to our sources, in 2011 both ATI and nVidia will offer parts with around 5-7TFLOPS of compute power, surpassing 10TFLOPS on the dual-ASIC parts. According to information at hand, Intel targeted 1+ TFLOPS of compute power for the first generation, i.e. less number crunching performance than ATI Radeon HD 4870 and nVidia GeForce GTX 285. With Larrabee coming in 2011, the company did revise that number to raise available performance.

We learned about the estimated cost of Larrabee project, and if there wasn't for best-selling Core 2 series, this project would seriously undermine Intel's ability to compete. To conclude this article - Larrabee was Gelsinger's baby, project got seriously messed up and somebody had to pay the bill. Patrick is staying in Santa Clara though, almost on the same address. Given his new job, Patrick P. Gelsinger simply moved from 2200 Mission College Blvd [Robert N. Noyce building, i.e. Intel HQ], to 2831 Mission College Blvd [EMC HQ].


© 2009 Bright Side Of News*, All rights reserved.



Related articles:

Tags:

Share and enjoy :)

  • Digg
  • del.icio.us
  • StumbleUpon
  • TwitThis
  • Reddit
  • Furl
  • Google
  • Technorati
  • Sphinn
  • Mixx
  • Facebook
  • LinkedIn
  • Slashdot
  • Newsvine
  • Ma.gnolia
  • BlinkList
  • connotea
  • Fark
  • MisterWong
  • Netvouz
  • PlugIM
  • Propeller
  • Simpy
  • SphereIt
  • Spurl
  • ThisNext
  • YahooMyWeb
  • co.mments
  • Live
  • MySpace
  • Yahoo! Buzz


Comments:

by: Anonymous on 9/28/2009
With the GloFo delay it might be cheaper to buy ATI from the liquidators than to buy NVidia.
by: Anonymous on 9/18/2009
''Wrong....I can tell you right now that we are pumping larabee out of our fab in new mexico.''

pumping larrabee out of your ass is more probable.
RE: New Mexico by: Theo Valich on 9/18/2009
Of course you are...there is no doubt that LRB is on the way... it's just the way "how it is on the way" is well documented here. And soon, there will be an article that will show how many hurdles Larrabee had to clear [and is still clearing].

Ed.
by: Anonymous on 9/18/2009
Wrong....I can tell you right now that we are pumping larabee out of our fab in new mexico.
by: Anonymous on 9/18/2009

if Larrabee doesn´t work, i have a feeling that Intel will try to buy Nvidia...(ya,i´m scared too...)
Leave a comment:

Author:

Title:

Comment:


Enter the code shown above:

(Note: If you cannot read the numbers in the above
image, reload the page to generate a new one.)




HD Videos & Slideshow
  • INTERVIEW: Mike Kreiten
  • AirLive AirVideo-2000
  • Ages Of Illathid
  • Aion
Highlight
  • Corsair Flash Voyager Sticks Come Unglued
  • EVGA, where did your lifetime warranty go?
  • Modern Warfare 2 tests our Short Attention Span
  • Duct tape, Pumpkin and Apples bring robot to life
  • Duct tape, Pumpkin and Apples bring robot to life
IP address change delay

Greetings,

The planned network provider change will not happen as planned, due to our site administrator ending in hospital as a consequence of his gliding accident. The wounds are not life-threatening but Mr. Ivica Hosko is still in the hospital, four days after the crash with transportation to Zagreb in two days time. We send our best wishes and hope for a speedy recovery. As soon as Mr. Hosko returns to his daily post, we'll announce the details of our network provider switch.

The following message is for Mr. Ivica himself:  "Ivica, you nut - gliding around a 2km/6600ft mountain with changeable winds in November?"

Thanks for understanding,

Ed-in-chief

© 2009 Bright Side Of News*, All rights reserved.